Installation of steel columns

A batch of metal columns arrived at the site – we started unloading and installing them on two floors at once. This technology allows us to speed up construction and ensure maximum strength of the supporting frame. The columns are securely fixed to the formwork and then the structures are welded.

Special attention should be paid to the welded seams – they are perfectly executed: even, neatly, without excess metal. This level of quality is rare in the industry, and we are proud to have true professionals working for us.

We have already received the first quality certifications for materials and work performed, which confirms compliance with all building standards.

In parallel, the formwork for pouring the reinforced concrete columns is being installed at the site – concrete pouring works are scheduled for this Saturday, 16 August 2025. We are on schedule, ensuring the highest quality at every stage.