{"id":6444,"date":"2025-06-16T11:11:00","date_gmt":"2025-06-16T09:11:00","guid":{"rendered":"https:\/\/nerja-apart.es\/%d1%81%d0%bd%d0%be%d1%81-%d0%b7%d0%b0%d0%b2%d0%b5%d1%80%d1%88%d1%91%d0%bd-%d0%b2%d0%b5%d0%b4%d1%83%d1%82%d1%81%d1%8f-%d1%80%d0%b0%d0%b1%d0%be%d1%82%d1%8b-%d0%bf%d0%be-%d0%bf\/"},"modified":"2025-11-23T08:11:04","modified_gmt":"2025-11-23T07:11:04","slug":"demolition-is-complete-foundation-preparation-is-underway","status":"publish","type":"post","link":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/","title":{"rendered":"Demolition is complete \u2013 foundation preparation is in progress"},"content":{"rendered":"\n<p>On 14 June 2025, the demolition phase of the old building was officially completed, and we moved on to the next important stage \u2013 excavating a 40 cm-deep trench. At this stage, we are also collecting soil samples for geological testing, which are necessary to assess the load-bearing capacity of the soil and to further evaluate the accuracy of the foundation design.<\/p>\n\n\n\n<p>The next step is the preparation of the foundation base: the crushed stone has already been delivered and spread, all installation works have been completed, and the concrete has been poured.<\/p>\n\n\n\n<div class=\"wp-block-envira-envira-gallery\"><div id=\"envira-gallery-wrap-6277\" class=\"envira-gallery-wrap envira-gallery-theme-base envira-lightbox-theme-base\" itemscope itemtype=\"https:\/\/schema.org\/ImageGallery\"><div data-row-height=\"\" data-gallery-theme=\"\" id=\"envira-gallery-6277\" class=\"envira-gallery-public  envira-gallery-1-columns envira-clear envira-gallery-css-animations\" data-envira-columns=\"1\"><div id=\"envira-gallery-item-6119\" class=\"envira-gallery-item enviratope-item envira-gallery-item-1 envira-lazy-load\" style=\"padding-left: 5px; padding-bottom: 10px; padding-right: 5px;\"  itemscope itemtype=\"https:\/\/schema.org\/ImageObject\"><div class=\"envira-gallery-item-inner\"><div class=\"envira-gallery-position-overlay  envira-gallery-top-left\"><\/div><div class=\"envira-gallery-position-overlay  envira-gallery-top-right\"><\/div><div class=\"envira-gallery-position-overlay  envira-gallery-bottom-left\"><\/div><div class=\"envira-gallery-position-overlay  envira-gallery-bottom-right\"><\/div><div class=\"envira-lazy\" data-test-width=\"640\" data-test-height=\"480\" style=\"padding-bottom:75%;\"><img decoding=\"async\" id=\"envira-gallery-image-6119\" class=\"envira-gallery-image envira-gallery-image-1\" data-envira-index=\"1\" src=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/09\/2__photo_2025-06-17_20-28-14-1024x768.jpg\" data-envira-src=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/09\/2__photo_2025-06-17_20-28-14-1024x768.jpg\" data-envira-gallery-id=\"6277\" data-envira-item-id=\"6119\" data-envira-caption=\"2__photo_2025-06-17_20-28-14-1024x768\" alt=\"\" title=\"2__photo_2025-06-17_20-28-14-1024x768\"  itemprop=\"thumbnailUrl\" data-envira-srcset=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/09\/2__photo_2025-06-17_20-28-14-1024x768.jpg 400w,https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/09\/2__photo_2025-06-17_20-28-14-1024x768.jpg 2x\" srcset=\"data:image\/gif;base64,R0lGODlhAQABAIAAAP\/\/\/\/\/\/\/yH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" \/><\/div><\/div><\/div><div id=\"envira-gallery-item-6132\" class=\"envira-gallery-item enviratope-item envira-gallery-item-2 envira-lazy-load\" style=\"padding-left: 5px; padding-bottom: 10px; padding-right: 5px;\"  itemscope itemtype=\"https:\/\/schema.org\/ImageObject\"><div class=\"envira-gallery-item-inner\"><div class=\"envira-gallery-position-overlay  envira-gallery-top-left\"><\/div><div class=\"envira-gallery-position-overlay  envira-gallery-top-right\"><\/div><div class=\"envira-gallery-position-overlay  envira-gallery-bottom-left\"><\/div><div class=\"envira-gallery-position-overlay  envira-gallery-bottom-right\"><\/div><div class=\"envira-lazy\" data-test-width=\"640\" data-test-height=\"480\" style=\"padding-bottom:75%;\"><img decoding=\"async\" id=\"envira-gallery-image-6132\" class=\"envira-gallery-image envira-gallery-image-2\" data-envira-index=\"2\" src=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/09\/4_photo_2025-06-19_11-22-02-1024x768.jpg\" data-envira-src=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/09\/4_photo_2025-06-19_11-22-02-1024x768.jpg\" data-envira-gallery-id=\"6277\" data-envira-item-id=\"6132\" data-envira-caption=\"4_photo_2025-06-19_11-22-02-1024x768\" alt=\"\" title=\"4_photo_2025-06-19_11-22-02-1024x768\"  itemprop=\"thumbnailUrl\" data-envira-srcset=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/09\/4_photo_2025-06-19_11-22-02-1024x768.jpg 400w,https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/09\/4_photo_2025-06-19_11-22-02-1024x768.jpg 2x\" srcset=\"data:image\/gif;base64,R0lGODlhAQABAIAAAP\/\/\/\/\/\/\/yH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" \/><\/div><\/div><\/div><\/div><\/div><noscript><img decoding=\"async\" src=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/09\/2__photo_2025-06-17_20-28-14.jpg\" alt=\"\" \/><img decoding=\"async\" src=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/09\/4_photo_2025-06-19_11-22-02.jpg\" alt=\"\" \/><\/noscript><\/div>\n\n\n\n<p>All construction processes are supervised by the general contractor and the technical architect, who coordinate their work in close cooperation with the relevant regulatory bodies and local authorities, such as the local traffic department, the official board of architects, and the insurance service. The project is implemented in a coherent and precise manner, functioning as a single, integrated system.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/09\/7__photo_2025-06-19_13-43-50-1024x768.jpg\" alt=\"\" class=\"wp-image-6144\"\/><\/figure>\n\n\n\n<p><strong>Quality, adherence to technology, and meeting deadlines<\/strong> are the foundation of our construction philosophy. We continue to move forward and do everything possible to make your future home a model of reliability and comfort. <\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On 14 June 2025, the demolition phase of the old building was officially completed, and we moved on to the next important stage \u2013 excavating a 40 cm-deep trench. At this stage, we are also collecting soil samples for geological testing, which are necessary to assess the load-bearing capacity of the soil and to further&hellip;<\/p>\n","protected":false},"author":1,"featured_media":6109,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[7],"tags":[],"class_list":["post-6444","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"On 14 June 2025, the demolition phase of the old building was officially completed, and we moved on to the next important stage \u2013 excavating a 40 cm-deep trench. At this stage, we are also collecting soil samples for geological testing, which are necessary to assess the load-bearing capacity of the soil and to further\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"nerja-apart-es.preview-domain.com\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Nerja Apartment - Modern Apartment Vida Del Mar\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Demolition is complete \u2013 foundation preparation is in progress - Nerja Apartment\" \/>\n\t\t<meta property=\"og:description\" content=\"On 14 June 2025, the demolition phase of the old building was officially completed, and we moved on to the next important stage \u2013 excavating a 40 cm-deep trench. At this stage, we are also collecting soil samples for geological testing, which are necessary to assess the load-bearing capacity of the soil and to further\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2024\/08\/logo_final_black-142x32-1.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2024\/08\/logo_final_black-142x32-1.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-06-16T09:11:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-11-23T07:11:04+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Demolition is complete \u2013 foundation preparation is in progress - Nerja Apartment\" \/>\n\t\t<meta name=\"twitter:description\" content=\"On 14 June 2025, the demolition phase of the old building was officially completed, and we moved on to the next important stage \u2013 excavating a 40 cm-deep trench. At this stage, we are also collecting soil samples for geological testing, which are necessary to assess the load-bearing capacity of the soil and to further\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2024\/08\/logo_final_black-142x32-1.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/demolition-is-complete-foundation-preparation-is-underway\\\/#blogposting\",\"name\":\"Demolition is complete \\u2013 foundation preparation is in progress - Nerja Apartment\",\"headline\":\"Demolition is complete \\u2013 foundation preparation is in progress\",\"author\":{\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/author\\\/nerja-apart-es\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/nerja-apart.es\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/\\u0437\\u0430\\u0433\\u043e\\u043b\\u043e\\u0432\\u043e\\u043a-_photo_2025-06-19_13-43-55.jpg\",\"width\":1280,\"height\":960},\"datePublished\":\"2025-06-16T11:11:00+02:00\",\"dateModified\":\"2025-11-23T08:11:04+01:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/demolition-is-complete-foundation-preparation-is-underway\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/demolition-is-complete-foundation-preparation-is-underway\\\/#webpage\"},\"articleSection\":\"News, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/demolition-is-complete-foundation-preparation-is-underway\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Vida Del Mar\",\"item\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/category\\\/news-en\\\/#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/category\\\/news-en\\\/#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/category\\\/news-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/demolition-is-complete-foundation-preparation-is-underway\\\/#listItem\",\"name\":\"Demolition is complete \\u2013 foundation preparation is in progress\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/#listItem\",\"name\":\"Vida Del Mar\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/demolition-is-complete-foundation-preparation-is-underway\\\/#listItem\",\"position\":3,\"name\":\"Demolition is complete \\u2013 foundation preparation is in progress\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/category\\\/news-en\\\/#listItem\",\"name\":\"News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/#organization\",\"name\":\"nerja-apart.es\",\"description\":\"Modern Apartment Vida Del Mar\",\"url\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/nerja-apart.es\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/logo_final_black-142x32-1.png\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/demolition-is-complete-foundation-preparation-is-underway\\\/#organizationLogo\",\"width\":142,\"height\":32},\"image\":{\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/demolition-is-complete-foundation-preparation-is-underway\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/author\\\/nerja-apart-es\\\/#author\",\"url\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/author\\\/nerja-apart-es\\\/\",\"name\":\"nerja-apart-es.preview-domain.com\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/demolition-is-complete-foundation-preparation-is-underway\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d27e010170d4f21436b82d7b6760c2bdad4ed1899391bdde6457e0d59e129bc7?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"nerja-apart-es.preview-domain.com\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/demolition-is-complete-foundation-preparation-is-underway\\\/#webpage\",\"url\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/demolition-is-complete-foundation-preparation-is-underway\\\/\",\"name\":\"Demolition is complete \\u2013 foundation preparation is in progress - Nerja Apartment\",\"description\":\"On 14 June 2025, the demolition phase of the old building was officially completed, and we moved on to the next important stage \\u2013 excavating a 40 cm-deep trench. At this stage, we are also collecting soil samples for geological testing, which are necessary to assess the load-bearing capacity of the soil and to further\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/demolition-is-complete-foundation-preparation-is-underway\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/author\\\/nerja-apart-es\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/author\\\/nerja-apart-es\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/nerja-apart.es\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/\\u0437\\u0430\\u0433\\u043e\\u043b\\u043e\\u0432\\u043e\\u043a-_photo_2025-06-19_13-43-55.jpg\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/demolition-is-complete-foundation-preparation-is-underway\\\/#mainImage\",\"width\":1280,\"height\":960},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/demolition-is-complete-foundation-preparation-is-underway\\\/#mainImage\"},\"datePublished\":\"2025-06-16T11:11:00+02:00\",\"dateModified\":\"2025-11-23T08:11:04+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/\",\"name\":\"nerja-apart.es\",\"description\":\"Modern Apartment Vida Del Mar\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/nerja-apart.es\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Demolition is complete \u2013 foundation preparation is in progress - Nerja Apartment","description":"On 14 June 2025, the demolition phase of the old building was officially completed, and we moved on to the next important stage \u2013 excavating a 40 cm-deep trench. At this stage, we are also collecting soil samples for geological testing, which are necessary to assess the load-bearing capacity of the soil and to further","canonical_url":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/#blogposting","name":"Demolition is complete \u2013 foundation preparation is in progress - Nerja Apartment","headline":"Demolition is complete \u2013 foundation preparation is in progress","author":{"@id":"https:\/\/nerja-apart.es\/en\/author\/nerja-apart-es\/#author"},"publisher":{"@id":"https:\/\/nerja-apart.es\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/09\/\u0437\u0430\u0433\u043e\u043b\u043e\u0432\u043e\u043a-_photo_2025-06-19_13-43-55.jpg","width":1280,"height":960},"datePublished":"2025-06-16T11:11:00+02:00","dateModified":"2025-11-23T08:11:04+01:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/#webpage"},"isPartOf":{"@id":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/#webpage"},"articleSection":"News, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/nerja-apart.es\/en\/#listItem","position":1,"name":"Vida Del Mar","item":"https:\/\/nerja-apart.es\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/nerja-apart.es\/en\/category\/news-en\/#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/nerja-apart.es\/en\/category\/news-en\/#listItem","position":2,"name":"News","item":"https:\/\/nerja-apart.es\/en\/category\/news-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/#listItem","name":"Demolition is complete \u2013 foundation preparation is in progress"},"previousItem":{"@type":"ListItem","@id":"https:\/\/nerja-apart.es\/en\/#listItem","name":"Vida Del Mar"}},{"@type":"ListItem","@id":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/#listItem","position":3,"name":"Demolition is complete \u2013 foundation preparation is in progress","previousItem":{"@type":"ListItem","@id":"https:\/\/nerja-apart.es\/en\/category\/news-en\/#listItem","name":"News"}}]},{"@type":"Organization","@id":"https:\/\/nerja-apart.es\/en\/#organization","name":"nerja-apart.es","description":"Modern Apartment Vida Del Mar","url":"https:\/\/nerja-apart.es\/en\/","logo":{"@type":"ImageObject","url":"https:\/\/nerja-apart.es\/wp-content\/uploads\/2024\/08\/logo_final_black-142x32-1.png","@id":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/#organizationLogo","width":142,"height":32},"image":{"@id":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/nerja-apart.es\/en\/author\/nerja-apart-es\/#author","url":"https:\/\/nerja-apart.es\/en\/author\/nerja-apart-es\/","name":"nerja-apart-es.preview-domain.com","image":{"@type":"ImageObject","@id":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/d27e010170d4f21436b82d7b6760c2bdad4ed1899391bdde6457e0d59e129bc7?s=96&d=mm&r=g","width":96,"height":96,"caption":"nerja-apart-es.preview-domain.com"}},{"@type":"WebPage","@id":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/#webpage","url":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/","name":"Demolition is complete \u2013 foundation preparation is in progress - Nerja Apartment","description":"On 14 June 2025, the demolition phase of the old building was officially completed, and we moved on to the next important stage \u2013 excavating a 40 cm-deep trench. At this stage, we are also collecting soil samples for geological testing, which are necessary to assess the load-bearing capacity of the soil and to further","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/nerja-apart.es\/en\/#website"},"breadcrumb":{"@id":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/#breadcrumblist"},"author":{"@id":"https:\/\/nerja-apart.es\/en\/author\/nerja-apart-es\/#author"},"creator":{"@id":"https:\/\/nerja-apart.es\/en\/author\/nerja-apart-es\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/09\/\u0437\u0430\u0433\u043e\u043b\u043e\u0432\u043e\u043a-_photo_2025-06-19_13-43-55.jpg","@id":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/#mainImage","width":1280,"height":960},"primaryImageOfPage":{"@id":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/#mainImage"},"datePublished":"2025-06-16T11:11:00+02:00","dateModified":"2025-11-23T08:11:04+01:00"},{"@type":"WebSite","@id":"https:\/\/nerja-apart.es\/en\/#website","url":"https:\/\/nerja-apart.es\/en\/","name":"nerja-apart.es","description":"Modern Apartment Vida Del Mar","inLanguage":"en-US","publisher":{"@id":"https:\/\/nerja-apart.es\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Nerja Apartment - Modern Apartment Vida Del Mar","og:type":"article","og:title":"Demolition is complete \u2013 foundation preparation is in progress - Nerja Apartment","og:description":"On 14 June 2025, the demolition phase of the old building was officially completed, and we moved on to the next important stage \u2013 excavating a 40 cm-deep trench. At this stage, we are also collecting soil samples for geological testing, which are necessary to assess the load-bearing capacity of the soil and to further","og:url":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/","og:image":"https:\/\/nerja-apart.es\/wp-content\/uploads\/2024\/08\/logo_final_black-142x32-1.png","og:image:secure_url":"https:\/\/nerja-apart.es\/wp-content\/uploads\/2024\/08\/logo_final_black-142x32-1.png","article:published_time":"2025-06-16T09:11:00+00:00","article:modified_time":"2025-11-23T07:11:04+00:00","twitter:card":"summary_large_image","twitter:title":"Demolition is complete \u2013 foundation preparation is in progress - Nerja Apartment","twitter:description":"On 14 June 2025, the demolition phase of the old building was officially completed, and we moved on to the next important stage \u2013 excavating a 40 cm-deep trench. At this stage, we are also collecting soil samples for geological testing, which are necessary to assess the load-bearing capacity of the soil and to further","twitter:image":"https:\/\/nerja-apart.es\/wp-content\/uploads\/2024\/08\/logo_final_black-142x32-1.png"},"aioseo_meta_data":{"post_id":"6444","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2025-09-30 11:42:44","updated":"2025-11-23 07:22:43","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/nerja-apart.es\/en\/\" title=\"Vida Del Mar\">Vida Del Mar<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/nerja-apart.es\/en\/category\/news-en\/\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tDemolition is complete \u2013 foundation preparation is in progress\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Vida Del Mar","link":"https:\/\/nerja-apart.es\/en\/"},{"label":"News","link":"https:\/\/nerja-apart.es\/en\/category\/news-en\/"},{"label":"Demolition is complete \u2013 foundation preparation is in progress","link":"https:\/\/nerja-apart.es\/en\/demolition-is-complete-foundation-preparation-is-underway\/"}],"_links":{"self":[{"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/posts\/6444","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/comments?post=6444"}],"version-history":[{"count":6,"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/posts\/6444\/revisions"}],"predecessor-version":[{"id":7165,"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/posts\/6444\/revisions\/7165"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/media\/6109"}],"wp:attachment":[{"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/media?parent=6444"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/categories?post=6444"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/tags?post=6444"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}