{"id":7226,"date":"2025-11-19T08:01:38","date_gmt":"2025-11-19T07:01:38","guid":{"rendered":"https:\/\/nerja-apart.es\/%d1%84%d0%b8%d0%bd%d0%b0%d0%bb%d1%8c%d0%bd%d0%be%d0%b5-%d0%bf%d0%b5%d1%80%d0%b5%d0%ba%d1%80%d1%8b%d1%82%d0%b8%d0%b5-%d0%b7%d0%b0%d0%bb%d0%b8%d1%82%d0%be-%d0%bf%d1%80%d0%b8%d1%81%d1%82%d1%83\/"},"modified":"2025-12-04T08:11:20","modified_gmt":"2025-12-04T07:11:20","slug":"the-final-slab-is-poured-lets-start-building-the-pool","status":"publish","type":"post","link":"https:\/\/nerja-apart.es\/en\/the-final-slab-is-poured-lets-start-building-the-pool\/","title":{"rendered":"The final floor slab has been poured \u2014 we are starting work on the swimming pool."},"content":{"rendered":"\n<p>We have successfully completed the pouring of the final floor slab of our building and can now move on to the construction of the rooftop swimming pool.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/1-1024x768.jpeg\" alt=\"\" class=\"wp-image-7220\" srcset=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/1-1024x768.jpeg 1024w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/1-300x225.jpeg 300w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/1-768x576.jpeg 768w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/1-1536x1152.jpeg 1536w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/1-370x278.jpeg 370w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/1-760x570.jpeg 760w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/1-600x450.jpeg 600w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/1.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p>Before pouring the pool basin, our specialists are installing a layer of thermal insulation. This system prevents condensation and eliminates the risk of moisture in the apartments located below the pool \u2014 a very important factor for the comfort and health of the apartment owners and for the building&#8217;s long-term durability. <\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/2-1024x768.jpeg\" alt=\"\" class=\"wp-image-7221\" srcset=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/2-1024x768.jpeg 1024w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/2-300x225.jpeg 300w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/2-768x576.jpeg 768w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/2-1536x1152.jpeg 1536w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/2-370x278.jpeg 370w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/2-760x570.jpeg 760w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/2-600x450.jpeg 600w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/2-rotated.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"680\" src=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/3-1024x680.jpg\" alt=\"\" class=\"wp-image-7222\" srcset=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/3-1024x680.jpg 1024w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/3-300x199.jpg 300w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/3-768x510.jpg 768w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/3-1536x1020.jpg 1536w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/3-370x246.jpg 370w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/3-760x505.jpg 760w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/3-600x398.jpg 600w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/3.jpg 1928w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p>Meanwhile, additional construction works are advancing: the staircase on the top floor is being poured, and the walls and partitions in the technical roof area are taking shape. Gradually, the final architectural silhouette of the building is beginning to take shape. <\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"680\" src=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/4-1024x680.jpg\" alt=\"\" class=\"wp-image-7223\" srcset=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/4-1024x680.jpg 1024w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/4-300x199.jpg 300w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/4-768x510.jpg 768w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/4-1536x1020.jpg 1536w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/4-370x246.jpg 370w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/4-760x505.jpg 760w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/4-600x398.jpg 600w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/4.jpg 1928w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p>In the near future, workers will begin dismantling the temporary slab supports on the lower floors. After that, the active delivery of materials for the construction of walls and internal partitions on the lower levels will begin. <\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"680\" src=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/5-1024x680.jpg\" alt=\"\" class=\"wp-image-7224\" srcset=\"https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/5-1024x680.jpg 1024w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/5-300x199.jpg 300w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/5-768x510.jpg 768w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/5-1536x1020.jpg 1536w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/5-370x246.jpg 370w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/5-760x505.jpg 760w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/5-600x398.jpg 600w, https:\/\/nerja-apart.es\/wp-content\/uploads\/2025\/12\/5.jpg 1928w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p>Construction is progressing confidently and dynamically \u2014 each stage brings us closer to creating a modern and reliable home.<\/p>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We have successfully completed the pouring of the final floor slab of our building and can now move on to the construction of the rooftop swimming pool. Before pouring the pool basin, our specialists are installing a layer of thermal insulation. This system prevents condensation and eliminates the risk of moisture in the apartments located&hellip;<\/p>\n","protected":false},"author":1,"featured_media":7227,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[192],"tags":[],"class_list":["post-7226","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/posts\/7226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/comments?post=7226"}],"version-history":[{"count":5,"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/posts\/7226\/revisions"}],"predecessor-version":[{"id":7249,"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/posts\/7226\/revisions\/7249"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/media\/7227"}],"wp:attachment":[{"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/media?parent=7226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/categories?post=7226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nerja-apart.es\/en\/wp-json\/wp\/v2\/tags?post=7226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}